Slag handling complex
in "Azovstal" Iron and Steel works,
Mariupol, Ukraine

     Azovstal. Begin constructionThe works on the project for the metallurgic combine “Azovstal” in Mariupol, Ukraine, have begun in 2003. Based on the experience gained from two projects (at that time Alchevsk metallurgic combine and Nizhnedneprovsk pipe factory), AMCOM LLC proposed a complex, in which large parts of material were sorted via a drum screen in the early steps of the process. A similar solution had already been implemented in the Ukraine in 1998 (Yenakievo, Donetsk region, Ukrainian-Finnish JSC “Ecometall”). Furthermore, our specialists have perfected and improved many of the material reloading nodes. Special attention was paid to the possibility of fine tuning the equipment for achieving the necessary product quality and thus reaching the most effective economic results.
Azovstal. Deliveries of the equipment     At the end of 2003 there was signed the contract between AMCOM LLC and “Azovstal” Iron and Steel Works (Mariupol, Ukraine), for delivery the slag handling equipment recycling complex and mobile equipment. The equipment set also included two hydraulic excavators KOMATSU PC450 and a wheeled loader KOMATSU WA470, which have proven themselves very well working in such conditions.Azovstal. Presentation
     The first equipment deliveries begun already, in February of 2004. In parallel with them, the site for the slag recycling complex was being prepared with the combine’s resources. In the end of May 2004 the equipment had been delivered to the combine and the complex construction has started.
          Within a record short time frame the equipment was installed by the AMCOM LLC specialists. On July 24th, 2004 the grand opening of the slag recycling complex of the metallurgic combine “Azovstal” took place.
In the present time the complex is working and is returning to the combine the much needed materials for the steel mill, the black furnace shop and the sintering plant.